Sarajevo Airport’s long-awaited new terminal building is set to be completed later this year as the construction of the facility enters its final phase. The new building will cover an expansive area of 10,000 square metres across four floors, boasting state-of-the-art amenities designed to elevate passengers’ travel experience.
The terminal will be equipped with twelve raised-floor check-in desks, provided by Gate Technologies Airport Furniture Ltd and installed by Profluss, and five gates to handle the expected passenger influx. The facility’s standout feature, a sleek glass air bridge, has already been installed and connected to the building. This contemporary design element is set to replace the airport’s two existing air bridges, giving the airport a modern and seamless aesthetic.
With the new facility linked to the existing terminal, Sarajevo Airport’s overall handling capacity will increase to two million passengers annually. The airport is also in the process of installing a new automated baggage handling system to streamline passenger processing and improve efficiency.